ENGLISH MANUAL · VERSION 1.0.1

ForsetiFest

From a selected film list to a numbered, ready-to-print festival edition.

Free guide and fictional outputs. Application not included. Inspect the program, staff sheets and timing example before buying. Running these steps with your own films requires the separately purchased ForsetiFest app. This is not a free trial.

Three-step quick start

  1. Extract the whole buyer ZIP. Open app/ForsetiFest.html in desktop Google Chrome. It works from a local file with no server, account or network. Tested on Linux with Chrome; other browsers are not verified.
  2. Click Load Harbor Lights. In Build blocks, the Coastlines show totals 53:00: films 28:00, intro 5:00, trailers 2:00, two 1:00 gaps, Q&A 12:00, buffer 4:00. At 18:00:00 it ends 18:53:00. With 10:00 room turnaround, the next Pier Cinema show starts at exactly 19:03:00.
  3. In Review & issue, choose E001, open a public or staff preview, and click Export edition ZIP. The sample already includes E001. For your next draft, edit a screening, resolve issues, open both draft proofs, then click Issue next edition. Print either preview through Chrome’s Print → Save as PDF.
Actual ForsetiFest block builder showing three shorts blocks, one feature and timing totals
The block builder shows each film, its theme, order controls, timing arithmetic and film start offsets.

Start with your own films

Click New project. Fill festival name, local-time label, inclusive first/last dates (up to 14), screen names (one per line, up to four) and room turnaround. The label is descriptive; the app performs wall-clock arithmetic and does not apply timezone or daylight-saving rules. If a show crosses a clock change, split or manually adjust the event before issuing.

Add films by hand or choose Import film CSV. In the film form, section/theme, synopsis and internal note are optional. To use the keyboard, press Tab to focus Import film CSV, then Enter or Space to open the file chooser. The file must be UTF-8, comma-separated, at most 1 MiB and contain a header. Map required id, title, runtime_mmss columns; optionally map section, synopsis, note. Use a quoted cell for a comma or newline, and double a quote inside a quoted cell. Runtime is always mm:ss, never guessed. Review the preview and apply. An error rejects the whole import and leaves the current project intact. Import replaces the film shelf, so IDs used in blocks must remain present.

Actual CSV import preview with column mapping and three film rows
Map columns and inspect source rows before replacing the film shelf.

Stable film IDs link blocks and editions. Public synopsis goes to the audience program; internal note appears only on staff run sheets. Keep text within visible field limits. The CSV template button downloads a starting file.

Build and place shows

Add a block, give it an ID and name, then choose films from the shelf. A single-film block works for a feature. Use the arrow buttons, including by keyboard Tab and Enter, to reorder. Remove a film from one block and add it to another to move it. Set intro, trailers, between-film gap, Q&A and end buffer separately. A gap occurs between films, not after the last. The breakdown and film start offsets update as you edit.

Place a screening by choosing block, screen, date, start and explicit latest finish date/time. Time inputs accept HH:MM or HH:MM:SS; the editor validates hours 00–23, minutes and seconds 00–59, and all calculated displays show seconds. Use an end date after the start date for midnight crossings. The schedule grid and ordered rows show the same placement. Edit a screening to move it. Mark a repeated screening deliberately with the Intentional repeat checkbox; unmarked duplicate film assignments block issuance.

Latest finish and room turnaround are different. A show must end by its latest finish; the next show in the same room may start only after the prior show end plus turnaround. A screening at 19:02:59 after Harbor Lights S01 would conflict, while 19:03:00 is exact.

Review, issue, revise

Review & issue lists specific errors for invalid project data, late shows, duplicate assignment and room collisions. Correct the draft until it says Ready for proof. An empty schedule cannot be issued. Unassigned films are counted and may remain excluded. Open Proof public program and Proof staff run sheets to check the current draft before issuing. Both proofs are marked DRAFT PROOF · NOT ISSUED, on every page of a Chrome PDF, including continuation pages. Draft proofs can be printed to PDF; the edition ZIP export contains only an issued snapshot. The review shows a short comparison with the latest edition. An unchanged draft cannot create a duplicate edition. Click Issue next edition to freeze a numbered snapshot. Later draft edits do not alter prior editions. Select any edition in the dropdown to preview or export that snapshot.

Actual review showing a turnaround collision for screening S02
A 19:02 start produces a blocking room-turnaround issue with the precise 19:03:00 ready time.
Current draft review with proof controls and changes from the latest edition
Review current changes and open marked proofs before issuing.
Actual review with E001 selected and public, staff and ZIP export controls
The original Harbor Lights example already has E001 selected for preview or ZIP export.

The revision report compares the chosen edition with the prior one, including added, removed and moved screenings plus changed block order, timing, runtime or film text. It is a human-readable change summary; inspect all files before sharing.

Try one revision before using your own program

  1. Load Harbor Lights. E001 is already issued. In Place screenings, edit S02: 19:02 creates a turnaround conflict; change it to 19:04 and save.
  2. In Film shelf, edit HL01 and set its internal note to Projection cue: check lamp. The review lists the moved screening and staff-note change.
  3. Open both draft proofs. The staff proof includes the note; the audience program does not. Both carry DRAFT PROOF · NOT ISSUED. Check E001: it still has the original 19:03 screening and original staff note.
  4. Issue E002, select it and export. Its schedule has S02 at 19:04. The staff sheet and revision report include the note; the public HTML does not. Save project separately to keep both editions and the editable draft.
Actual public draft proof with DRAFT PROOF NOT ISSUED warning
A marked proof is a review copy. The warning repeats on every page of the tested Chrome PDF; issued output has no draft mark.

Inspect the actual files from this exercise:

Share the audience HTML with the audience. Staff sheets, revision report, schedule/edition data and saved projects are working files and may contain internal notes. Do not distribute the whole edition ZIP as an audience handout.

Save, open and print

Save project downloads a JSON containing draft and all editions. Keep it in a chosen folder. Open project reads that JSON; an invalid or oversized file leaves the current project untouched. An unsaved-changes label is visible in the header. Chrome may add a suffix to downloads with the same name; ForsetiFest never silently replaces your source file.

Export edition ZIP contains public-program.html, staff-run-sheets.html, schedule.csv, edition.json, revision-report.txt and SHA256SUMS.txt. Every file is for the selected edition. Public HTML excludes internal notes. The SHA-256 list checks file integrity; it is not a signature or proof of authorship. Open HTML locally, then Chrome Print → Save as PDF; choose A4, Default scale and backgrounds if desired. Print preview can span multiple pages. Check the preview before distribution. ZIP export is a download, not online publication.

Preview buttons open HTML in a new tab. If Chrome blocks the tab, allow popups for this local file or open the corresponding HTML from the exported ZIP. The exported HTML is self-contained.

Limits and troubleshooting

LimitValue
Films / blocks / screenings / rooms100 / 40 / 60 / 4
Inclusive festival days14
CSV / saved project1 MiB / 8 MiB
Film ID / title / section40 / 120 / 80 characters
Synopsis / internal note500 characters each
Festival, room, time label100 characters each

If import fails, inspect the row number, quoting, mapping and runtime format in the visible error. If issuing is disabled, read the listed issue and edit that record; an empty or unchanged draft also cannot be issued. If an exported program does not show a draft edit, issue a new edition and select it before exporting. For a midnight show, set latest finish to the following date. If a file fails to open, confirm it is a ForsetiFest 1.x JSON below the size limit.

All editing and export occur locally. No account or network connection is needed. The app has no sync or backup service; keep the downloaded JSON and ZIPs yourself. To uninstall, delete the extracted folder and any downloaded files you chose to keep. No browser storage is needed.

Scope: no tickets, rights checks, film media, DCP/projector acceptance, collaboration, direct FilmFreeway import, automatic scheduling, or automatic timezone/DST conversion. Desktop Chrome on Linux is verified; narrow layout was inspected at 390px but complete phone editing is not claimed. This manual's images are actual runtime captures from the fictional Harbor Lights example.